Initial operation

Before the Initial operation:
  • Checking the assembly documents
  • Checking the material lists
  • Execution control
  • Quality inspection
  • Functional check of the complete switchgear in the plant
  • Factory acceptance in the presence of the customer
Initial operation - without load:
  • Loops check
  • Commissioning of function groups with water cycles
  • Creation of test protocols for cables/measurement technology/consumers
  • Installer declaration
Initial operation - with load:
  • Creation of operation concepts during running production
  • Function test of complete system manual/automatic
  • Restart with/without emergency power system
  • Isolated operation for CHP functional groups
  • Accompaniment of the final operation by software engineer
  • Remote change service